Project Description

Turfrey carried out extensive CMP Rangitikei 1 year Hydraulic Services Works to the new plant. This project is a major facility on a greenfield site, designed to process 3.5 lambs per minute. Product from the slaughter floor is processed through a fully automated mechanical chiller and state-of-the-art cutting room to provide premium product ready for the supermarket shelf. Total building area is 6,800m2 spread over 5 buildings. The structures generally comprise concrete floor slabs, structural steel portal frames, EPS panel walls and ColorSteel roofs.